Projects Needed

 

PROJECT 001-10: Memorial Garden Beds

Design and construct garden beds around both the new school and church.

Estimanted cost: TBC

Date Scheduled: March 2010

Items needed: TBC

PROJECT 002-10: Vegetable garden

Construction of new vegetable garden.

Estimanted cost: TBC

Date Scheduled: 2010

Items needed: TBC

PROJECT 003-10: Planting with Shade Shelter

Design and construct garden beds with a shade shelter.

Estimanted cost: TBC

Date Scheduled: March 2010

Items needed: TBC

PROJECT 004-10: Planting around the school

Design and construct garden beds

Estimanted cost: TBC

Date Scheduled: March 2010

Items needed: TBC

PROJECT 004-10: General clean within the grounds

Date Scheduled: 2009

Items needed: TBC